Over 13 Years of HVAC systems sizing, selection and documentation experience across Government, Military, Municipal, Higher Education, Research Laboratories, Industrial, Healthcare, and Medical Facilities.
US Coast Guard | BSU Alameda Coast Guard Island, CA
Scope & Size: $23M Design/Build 34,400 sq. ft. secure facility housing command spaces, classrooms, and offices.
Mechanical & Sustainable Design: Designed Variable Refrigerant Flow (VRF) heat-recovery heat pumps, SCIF-compliant acoustical duct silencers, and solar thermal domestic hot water heating.
USGBC LEED Platinum Certified
Malmstrom AFB | Great Falls, MT
Scope & Size: Design/Build new construction consisting of Munitions Maintenance Handling Facility (5,931 sqft) and two new 2,230 sqft Munitions Igloos.
Fairchild Air Force Base | Spokane, WA
Scope & Size: $11.9M, 27,000 sq. ft. command headquarters facility for two Air Refueling Wings.
Mechanical & Sustainable Design: Executed building heating/cooling load calculations, eQuest energy models, and VAV multi-zone damper control systems.
USGBC LEED Gold Certified
US Army Corps of Engineers | Nationwide
Scope: Comprehensive federal policy revision integrating UFC 1-200-02 High Performance and Sustainable Building Requirements into ER 1110-345-100 (Design Policy) and ER 1110-345-700 (Engineering Design Analysis).
Role & Impact: Established standard military HVAC design metrics, mandatory eQuest energy modeling compliance criteria, and renewable energy feasibility protocols across all service branches. Revised design requirements based on common design practices, new technology and other advancements in energy sustainability practices in construction.
University of Washington | Seattle, WA
Scope & Size: $171M, 207,000 sq. ft. flagship biology research facility with 7 floors of flexible wet lab space, faculty offices, and a 20,000 sq. ft. research greenhouse.
Mechanical & Sustainable Design: Engineered high-performance HVAC systems incorporating active chilled beams, heat-recovery chillers (extracting waste heat from lab exhaust for greenhouse heating), and automated natural ventilation trickle vents.
USGBC LEED Gold Certified (AIA COTE Top Ten Award Winner)
University of Washington - Bill & Melinda Gates Center | Seattle, WA
Scope & Size: $110M, 138,000 sq. ft. complex housing wet labs for molecular information systems, robotics research labs, a 240-seat auditorium, and instructional spaces.
Mechanical & Sustainable Design: Designed high-efficiency Variable Air Volume (VAV) system zones, low-velocity displacement ventilation in public gathering spaces, and dedicated CRAC cooling units for server equipment.
USGBC LEED Silver Certified
University of Washington | Seattle, WA
Scope & Size: $88M, 78,000 sq. ft. expansion built above MolES, housing ISO-class cleanrooms, clean energy testbeds, and advanced characterization labs.
Mechanical & Sustainable Design: Executed eQuest building energy modeling, high-volume air change rate sizing for cleanroom fan filter units, chemical exhaust fan sizing, and sub-grade vibration-isolated duct routing.
USGBC LEED Silver Certified
University of Washington | Seattle, WA
Scope & Size: $78M, 90,000 sq. ft. interdisciplinary nanotechnology and bio-engineering research facility.
Mechanical & Sustainable Design: Implemented a dual-mode HVAC strategy: user-controlled operable windows coupled with automated natural ventilation trickles in office zones, and 100% dedicated outdoor air supply with energy-recovery heat wheels for vibration-sensitive wet labs.
USGBC LEED Gold Certified
University of Washington - Warren G. Magnuson Health Sciences Center | Seattle, WA
Scope: Upgrades and modernization of animal research/vivarium facilities and associated mechanical, electrical, and plumbing (MEP) systems on the sixth floor.
Mechanical Design: Features a 100% outside air system engineered with N+1 redundancy, strict velocity caps for acoustic mitigation, and cascading pressure controls to maintain a highly stable, contaminant-free animal research environment.
University of Washington - Warren G. Magnuson Health Sciences Center | Seattle, WA
Scope & Size: 32,000 sq. ft. targeted mechanical and interior renovation of the J-Wing 1st and 2nd floors housing high-density microbiology research labs and teaching spaces.
Mechanical & Sustainable Design: Re-engineered complex laboratory exhaust systems, variable air volume (VAV) air handlers, specialized directional pressurization, and high-efficiency hydronic heating/cooling coil integrations within existing health sciences infrastructure.
Thuwal, Saudi Arabia
Scope & Size: 5.5 Million sq. ft. greenfield research university campus comprising 27 major research and academic buildings.
Mechanical & Sustainable Design: Key contributor to central cooling plant design featuring 42,000-ton chilled water generation, Thermal Energy Storage (TES) ice tanks, solar thermal wind-towers for passive courtyard air distribution, and sea-water cooling loops.
USGBC LEED Platinum Certified (World’s largest LEED Platinum campus)
Washington State University | Pullman, WA
Scope & Size: 62,000 sq. ft. flagship research center featuring Biosafety Level 2 (BSL-2) and BSL-3 laboratory suites, disease diagnostic facilities, and open collaborative workspaces.
Mechanical & Sustainable Design: Designed high-containment directional airflow ventilation, 100% dedicated outdoor air systems (DOAS) with exhaust filtration for BSL-3 research zones, and state-of-the-art energy management controls to ensure seamless thermal transitions between wet labs and office spaces.
USGBC LEED Silver Standard Design
Washington State University | Spokane, WA
Scope & Size: $78.6M, 125,000 sq. ft. health sciences facility featuring anatomy labs, vivariums, and pharmaceutical research suites.
Mechanical & Sustainable Design: Designed 100% dedicated outdoor air system (DOAS) handling units, glycol run-around heat recovery loops, and strict vivarium pressurization control sequences.
USGBC LEED Silver
Iowa State University | Ames, IA
Scope & Size: $100M+, 244,300 sq. ft. multi-phase complex housing the Biorenewables Research Laboratory, Elings Hall, and Sukup Hall for Agricultural Engineering.
Mechanical & Sustainable Design: Modeled energy performance in eQuest, designed heat recovery run-around loops for high-bay bio-processing research labs, and integrated central atrium smoke evacuation systems.
USGBC LEED Gold Certified
University of California | Berkeley, CA
Scope & Size: $160M, 200,000 sq. ft. biomedical center with BSL-3 laboratory suites, brain imaging MRI facilities, and teaching labs.
Mechanical & Sustainable Design: Performed VAV laboratory air handling calculations, toxic fume exhaust system routing, active chilled beam sizing, and integrated energy usage monitoring sensors.
USGBC LEED Gold Certified
Providence Alaska Medical Center | Anchorage, AK
Scope & Size: 150,000 sq. ft. hospital tower expansion featuring a 66-bassinet Level III NICU, 50 private room suites, and surgery expansions.
Mechanical & Sustainable Design: Engineered Sub-arctic winter freeze-protection HVAC systems, 100% redundant steam boiler plants, airborne infection isolation room (AIIR) pressure cascades, and high-efficiency glycol heat exchangers.
USGBC LEED Silver Certified (First LEED-certified hospital building in Alaska)
Smokey Point, WA
AIA/AAH Healthcare Design Award Winner
Scope & Size: $13.6M, 60,000 sq. ft. Lean-designed ambulatory surgery and multi-specialty care clinic.
Mechanical & Sustainable Design: Designed high-efficiency rooftop air handlers with VAV reheat zones, dedicated cooling loops for MRI imaging equipment, and variable-speed pumping systems.
Designed to LEED Silver Standards
Saskatoon, SK, Canada
Scope & Size: $283M, 312,000 sq. ft., 176-bed maternal and pediatric teaching hospital featuring PICU, NICU, and rooftop helipad.
Mechanical & Sustainable Design: Developed low-noise pediatric air distribution systems, radiant ceiling heating panels for infant thermal comfort, and energy recovery ventilation (ERV) tailored for harsh winter temperatures.
Designed to LEED Silver Standards
Seattle Children’s Hospital | Seattle, WA
Scope & Size: Multi-phase master plan campus expansion at the primary Laurelhurst hospital facility, featuring inpatient bed tower, critical care unit, surgical operating suites and cardiac catheterization labs.
Mechanical & Sustainable Design: Engineered ultra-low EUI healthcare HVAC systems incorporating 100% dedicated outdoor air ventilation with energy recovery loops, critical surgical airflow pressurization cascades, specialized isolation zone controls, and high-efficiency chilled water plants designed to reduce energy consumption by up to 47% compared to regional hospital benchmarks.
USGBC LEED Gold Certified
King County, WA
Scope: Energy Efficiency Improvements.
USGBC LEED Gold Certified
1100 Eastlake Data Center, Seattle, WA
Scope: To support rising research volume, computational throughput, and IT resilience, Seattle’s Fred Hutchinson Cancer Research Center (FHCRC) wanted to consolidate decentralized computing resources into a unified, mission critical facility. Housed within the adaptive reuse of a former office building alongside life science laboratories and cryogenic sample storage, the new 8,000 square foot, 750 kW, Tier II data center more than doubles prior institutional capacity. Delivered on an accelerated 18 month design and construction schedule for the same capital cost as a conventional mechanically cooled facility.
Mechanical & Sustainable Design: Custom built up, multi fan arrays draw 100% outside supply air from a shaded zone and below grade areaway, working in tandem with enclosed hot aisles to maximize thermal efficiency. Direct evaporative cooling supplements and extends the economizer cycle, while traditional chilled water coils provide backup cooling solely for extreme weather conditions. On the electrical side, an N+1 modular UPS, on site diesel generation, facility wide metering, and a direct secondary bypass feed ensure uninterrupted reliability. Together, these systems achieve "free cooling" during roughly 90% of annual operational hours and an industry leading Power Usage Effectiveness (PUE) of less than 1.1.
Washington State University, Pullman, WA
Scope: Renovation of Wood Processing Facility.
Mechanical System: High velocity wood dust exhaust system and make-up air ventilation system that includes an industrial wood dust shaker filter.